As per South Korean media outlet ETNews on May 27, Samsung Display (SDC) is building a pilot production facility for Micro LED smartwatch displays on a 5.5-generation Quarter Cut production line at its A2 campus in Asan, Chungcheongnam-do. An industry insider said the Micro LED process equipment includes transfer, bonding, inspection, and repair systems. Samsung Display had been evaluating equipment suppliers from late last year through early 2026, with the relevant tools expected to be installed within the year. After completing the pilot facility this yea…

Leave a Reply